Protocol Layer Testing of UE and eNode B for a leading Telecom Operator

November 1, 2019

Need

  • Protocol testing of PDPC, RLC and MAC
  • Synchronization of EAST, TM500 & Shenick Test equipment for control  and user plane
  • Generation of control and user plane load condition

Solution

  • Used EAST to test the lower layer of UE and eNode B for fast solution
  • Integrated EAST & TM500 and then with  Shenick .
  • Tested eNB remotely

Outcome

  • Tested  eNB with 200 UE load and FTP & http data load condition
Get in Touch
chatwithus