Need
- Testing system independently with limited test facility and Integrating system with live network.
- Upgrade and develop MINS (Mobile Integrated Network System)
Solution
- Tested HAL layer using automation test framework
- Performed feature and performance testing and integrated system with live network
- Tested maximum negative and error condition
Outcome
- Identified maximum issues of HAL(Hardware Abstraction Layer) and reduced integration timings